BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20170119T160000Z
DTEND:20170119T163000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:Webinar: Busted! The Top Six Myths of Lean Construction
DESCRIPTION:Busted! The Top Six Myths of Lean Construction\n\n \n\n\n\n	\n		\n			Date:\n			Thursday\, January 19\, 2017\n			Register Now\n		\n		\n			Time:\n			11:00 a.m. (ET) / 10:00 a.m. (CT) / 9:00 a.m. (MT) / 8:00 a.m. (PT)\n		\n		\n			Length:\n			30 minutes\n		\n		\n			Fee:\n			Free\n		\n		\n			Speakers:\n			John Wiegand\, BIM360 Integration Consultant\, Autodesk\n		\n	\n\nPRESENTED BY ABC's STRATEGIC PARTNER - AUTODESK \n\n\n\n\n\n\n\nWEBINAR DESCRIPTION \n\nThere are three types of people in the construction industry: Those who think they're already doing lean\, those who really are doing lean\, and those who wish everyone would shut up about it and let them get on with their work. And the one thing we all have in common is that we can't agree on what "lean construction" even means\, exactly. The unfortunate truth is that middle group\, those who actually have successfully implemented lean\, is very\, very small. \n\n\n\nThe truth is\, lean is not a thing you up and do and call it done. Lean is a way of being. It's a commitment\, an intentional and ongoing philosophy and process. If you're not eating\, drinking\, and dreaming lean\, you're not practicing lean. \n\n\n\nTHIS WEBINAR IS DESIGNED TO:\n\n	Explore the link between the implementation of technology and successful lean programs\n	Help attendees understand that implementing lean cannot be done alone\, it takes the extend team to both implement and continuously improve\n	Expose ways to democratize lean across all companies\, both large and small\n	Define what it really means to be "lean" in construction\n	Demonstrate and recognize the myths (and truths) around lean construction
X-ALT-DESC;FMTTYPE=text/html:<h2 class="post-title">Busted! The Top Six Myths of Lean Construction</h2>\n\n<div class="post-meta">&nbsp\;</div>\n\n<div class="post-content">\n<table height="137" width="625">\n	<tbody>\n		<tr>\n			<td style="text-align: left\; vertical-align: top\;"><strong><span style="color: rgb(128\, 128\, 128)\; font-family: Calibri\;">Date:</span></strong></td>\n			<td style="width: 75%\; text-align: left\; vertical-align: top\;">Thursday\, January 19\, 2017</td>\n			<td rowspan="5" style="text-align: right\; vertical-align: top\;"><a href="https://attendee.gotowebinar.com/register/4692752288742052098" id="RegisterNow" target="_blank"><span><font color="#0066cc">Register Now</font></span></a></td>\n		</tr>\n		<tr>\n			<td style="text-align: left\; vertical-align: top\;"><strong><span style="color: rgb(128\, 128\, 128)\; font-family: Calibri\;">Time:</span></strong></td>\n			<td style="width: 75%\; text-align: left\; vertical-align: top\;">11:00 a.m. (ET) / 10:00 a.m. (CT) / 9:00 a.m. (MT) / 8:00 a.m. (PT)</td>\n		</tr>\n		<tr>\n			<td style="text-align: left\; vertical-align: top\;"><strong><span style="color: rgb(128\, 128\, 128)\; font-family: Calibri\;">Length:</span></strong></td>\n			<td style="width: 75%\; text-align: left\; vertical-align: top\;">30 minutes</td>\n		</tr>\n		<tr>\n			<td style="text-align: left\; vertical-align: top\;"><strong><span style="color: rgb(128\, 128\, 128)\; font-family: Calibri\;">Fee:</span></strong></td>\n			<td style="width: 75%\; text-align: left\; vertical-align: top\;">Free</td>\n		</tr>\n		<tr>\n			<td style="text-align: left\; vertical-align: top\;"><span style="color: rgb(128\, 128\, 128)\; font-family: Calibri\;"><strong>Speakers:</strong></span></td>\n			<td style="width: 75%\; text-align: left\; vertical-align: top\;">John Wiegand\, BIM360 Integration Consultant\, Autodesk</td>\n		</tr>\n	</tbody>\n</table>\n<strong>PRESENTED BY ABC&#39\;s STRATEGIC PARTNER - AUTODESK&nbsp\;</strong><br />\n<br />\n<a href="http://www.autodesk.com/"><img alt="" src="https://www.abc.org/Portals/1/autodesk-logo-rgb-color-logo-black-text-medium.png" /></a><br />\n<br />\nWEBINAR DESCRIPTION&nbsp\;<br />\nThere are three types of people in the construction industry: Those who think they&rsquo\;re already doing lean\, those who really are doing lean\, and those who wish everyone would shut up about it and let them get on with their work. And the one thing we all have in common is that we can&rsquo\;t agree on what &ldquo\;lean construction&rdquo\; even means\, exactly. The unfortunate truth is that middle group\, those who actually have successfully implemented lean\, is very\, very small.&nbsp\;<br />\n<br />\nThe truth is\, lean is not a thing you up and do and call it done. Lean is a way of being. It&rsquo\;s a commitment\, an intentional and ongoing philosophy and process. If you&rsquo\;re not eating\, drinking\, and dreaming lean\, you&rsquo\;re not practicing lean.&nbsp\;<br />\n<br />\nTHIS WEBINAR IS DESIGNED TO:\n<ul>\n	<li>Explore the link between the implementation of technology and successful lean programs</li>\n	<li>Help attendees understand that implementing lean cannot be done alone\, it takes the extend team to both implement and continuously improve</li>\n	<li>Expose ways to democratize lean across all companies\, both large and small</li>\n	<li>Define what it really means to be &ldquo\;lean&rdquo\; in construction</li>\n	<li>Demonstrate and recognize the myths (and truths) around lean construction</li>\n</ul>\n</div>\n
LOCATION:
UID:e.9143.598
SEQUENCE:3
DTSTAMP:20260428T041222Z
URL:https://business.abcnalabama.org/events/details/webinar-busted-the-top-six-myths-of-lean-construction-598
END:VEVENT

END:VCALENDAR
